Final Building Inspections Explained: Process, Regulations, and Best Practices
Last Updated Mar 10, 2025
Last Updated Mar 10, 2025

The final building inspection, a legal requirement in Australia, is the last major step before occupying a commercial building. This inspection ensures the building's compliance with safety and regulatory standards. A failed inspection can cause expensive delays, reinspection fees, and even liquidated damages, potentially stalling projects for weeks and impacting both contractors and building owners.
Pro Tip
For commercial projects, a final inspection is often necessary to secure an Occupancy Permit. While an inspector may carry out the inspection, it’s important to remember that the registered building surveyor (RBS) holds ultimate responsibility for approving the building’s compliance. Although RBSs often rely on third-party inspectors during construction, they are more likely to conduct the final inspection themselves due to its legal significance.
This guide details the inspection process, clarifying responsibilities and offering best practices to ensure a smooth approval.
Table of contents
What is a Final Inspection?
A final building inspection is the last step in the construction process, ensuring that a building meets all relevant codes, standards, and approved plans before it can be occupied. Conducted by a registered building surveyor (RBS) or a qualified inspector, this inspection verifies compliance in key areas, including:
- Compliance with National Construction Code (NCC)
- Alignment with approved construction plans
- Completion of all prerequisite inspections (structural, electrical, fire, plumbing, accessibility, etc.)
- Safety and suitability for use
Key Australian Regulations Governing Final Inspections
The National Construction Code (NCC) serves as the primary regulatory framework, covering aspects such as structural integrity, fire safety, energy efficiency, and accessibility. Each Australian state and territory has its own licensing, certification, and compliance requirements, governed by:
- Victoria – Victorian Building Authority (VBA)
- New South Wales – NSW Fair Trading
- Western Australia – Building and Energy WA
- South Australia – SA Building Codes
- Tasmania – Consumer, Building & Occupational Services
- Australian Capital Territory – ACT Planning and Land Authority
- Northern Territory – NT Building Practitioners Board
Final inspections must be conducted by a registered building surveyor per Australian Building Codes and state licensing requirements.
When Should a Final Inspection Happen?
Final building inspections occur at the end of the construction process, before:
- Applying for an occupancy permit
- Handing over the project to the owner
- Finalising retention payments for contractors
The final inspection should take place only after all prerequisite inspections (e.g., electrical, plumbing, structural) have been completed. Some states may also require additional inspections based on location, such as:
- Bushfire-prone area compliance (BAL Ratings in NSW, VIC, WA, SA)
- Flood zone construction standards (Queensland, Northern NSW, NT)
Pro Tip
To avoid delays, it is also a good idea to conduct an internal pre-inspection and a quality control check to identify and rectify issues, and have all compliance documents ready before scheduling the final walkthrough.
Who is Responsible for the Final Inspection?
Several key parties are involved in the final inspection process:
General Contractors
General contractors oversee the inspection process, ensure all compliance documents are in order, and coordinate subcontractors to address any last-minute issues.
Certifiers and Inspectors
Conduct the official final inspection by verifying compliance with the NCC and state regulations, approving certification, or flagging non-compliance issues as needed.
Building Owners
Typically take a passive role but should attend inspections to understand compliance issues.
Regulatory Bodies
Regulatory bodies oversee final inspection approvals and issue the Occupancy Permit once certification is complete.
Key Elements of a Final Building Inspection
Final inspections assess multiple aspects of a building’s readiness, including:
Structural Integrity
No visible cracks, subsidence, or defects; foundation, framing, and roofing meet NCC standards.
Fire Safety Compliance
Sprinklers, alarms, and extinguishers are installed and operational, and confirming that fire doors close automatically and escape paths are clear.
Electrical and Plumbing Checks
Circuits pass safety checks, no exposed wiring, drainage meets Australian plumbing standards (AS/NZS 3500).
Accessibility Compliance
Proper ramp slopes, door widths, and tactile indicators per Australian Disability Discrimination Act (DDA).
Energy Efficiency and Sustainability
Meets NABERS (National Australian Built Environment Rating System) requirements for insulation, ventilation, and glazing.
What to Do if Problems Are Found During the Inspection
Not every project passes its final building inspection on the first attempt, and the severity of the issue determines the consequences. Minor infractions, such as missing signage, can often be fixed quickly, though a reinspection fee may be required. However, major compliance failures, like non-compliant fire safety systems, demand significant corrections and re-certification, leading to costly delays. If an occupancy permit is withheld for an extended period, building owners may experience financial setbacks, while general contractors risk liquidated damages. Proactively addressing potential issues before the final inspection can help mitigate these risks.
Best Practices for a Smooth Final Inspection.
Plan Early
Schedule inspections well in advance and allow time for minor fixes and reinspections if needed.
Document Everything
Maintain comprehensive digital records of drawings, permits, and previous inspection reports to streamline compliance checks. Additionally, store high-quality photos of key safety features for quick reference during the final inspection process.
Engage Qualified Professionals
Pro Tip
Using cloud-based software allows teams to centralise inspection checklists, document changes in real time, and communicate seamlessly with inspectors, ensuring no compliance details are overlooked.
Work with experienced subcontractors familiar with local compliance requirements to avoid last-minute issues.
Use Construction Technology
Digital tools help track compliance, access previous reports, and address issues before the inspection. This proactive approach mitigates delays, reduces reinspection costs, and ensures a smoother path to obtaining occupancy permits
Maintain Open Communication
Regularly update all stakeholders, including inspectors and regulators, to prevent misunderstandings, facilitate prompt issue resolution, and ensure alignment on compliance requirements.
Ensuring a Smooth Path to Occupancy
A final building inspection is a critical step in ensuring that a commercial building in Australia is safe, compliant, and ready for occupancy. By thoroughly preparing for this inspection—through early planning, diligent documentation, engagement with qualified professionals, and leveraging construction technology—contractors and building owners can avoid costly delays and streamline the approval process. Given the potential financial and operational impacts of a failed inspection, a proactive approach is essential. By following best practices and maintaining clear communication with all stakeholders, project teams can ensure a smooth inspection process, secure timely occupancy permits, and successfully complete their projects with confidence.
Categories:
Tags:
Written by
Samantha Nemeny
Sam—Samantha if she’s feeling particularly academic—has spent a decade in content marketing, with eight years focused on Australia’s construction industry. She has a knack for making complex ideas easy to understand, turning industry jargon into clear, engaging stories. With a background in SEO and marketing, she’s spent the past three years at Procore, helping industry professionals navigate the world of construction with content that’s both insightful and easy to digest.
View profileReviewed by
Tom Proctor
Before joining the world of technology, Tom worked as a Contract Administrator. This hands-on experience gives him a unique perspective that he leverages in his current role at Procore, where he has been for the past two years. Tom is passionate about helping construction businesses understand best practices in project management solutions. He helps construction businesses understand best practices around project management solutions and the many benefits they can provide.
View profileExplore more helpful resources

The Important Role of Data Centres in Construction
From initial design and project management to completion, data plays an ever more significant role in the construction industry. As the relationship between data and tech – including new AI...

No Surprises, No Delays: The Power of Clear Communication with Subcontractors
A great construction project isn’t just about bricks and mortar—it’s about people. Subcontractors (subbies) play a critical role in ensuring projects meet quality, safety, and compliance standards. Their performance directly...

EPC Contractors in Australia & New Zealand: A Complete Guide
Engineering, Procurement, and Construction (EPC) contractors are an important part of large-scale infrastructure projects across Australia and New Zealand.These specialised firms offer a comprehensive solution for complex projects, managing the...

Construction Project Management Explained: Key Roles, Phases, and Best Practices
Construction is an incredibly demanding undertaking, involving a vast number of moving parts and precise requirements related to cost, timeframes, quality, and safety. Effective project management provides the structure, oversight,...