— 5 min read
How BIM is Transforming Construction
Last Updated Nov 29, 2023
Last Updated Nov 29, 2023
Builders have always relied on precisely-designed sets of plans to build great buildings. Building Information Modeling (BIM) solutions enable general contractors, specialty contractors, and owners to virtually build a structure before construction even begins. But the benefits of BIM aren't limited to architects and engineers -- contractors use BIM for everything from automating takeoffs to viewing design changes in real time.
Although there are many BIM solutions to choose from, most are difficult to use, inaccessible to the field, require advanced technical training, or don’t integrate with project management solutions. As BIM shifts from a nice-to-have to a necessity, those who fail to evaluate and leverage these benefits are at risk of falling behind in a rapidly-evolving industry.
Table of contents
What is BIM?
Building Information Modeling (BIM) is the process of creating a three-dimensional model of construction drawings. BIM software allows architects and designers to produce a virtual structure that includes data for all of the disciplines required to build it.
While BIM methodologies have been around the construction industry for over 20 years, many companies don't realize the full benefits of BIM because they fail to gain adoption of software point solutions they deploy. Rework can drain a budget — one industry report found that a single design clash costs $1,500 on average. BIM reduces rework and keeps projects moving by giving reliable access to 3D models and empowering superintendents, foremen, and the trades to do their best work.
Benefits of Using BIM for Construction Management
Better Planning
4D BIM is an invaluable scheduling and planning tool. Blending scheduling data with a 3D information model gives stakeholders a holistic end-to-end image of a project. This helps management teams to detect clashes before they occur and build out plans with valuable insights in mind.
Improved Collaboration
BIM gives all stakeholders—from the office to the field—a shared view of a project and breaks down information silos. Since architecture and design are hyper-iterative processes that used to be very manual, reliable access to shared information is more important than ever today.
If architects, structural engineers, and builders are all viewing different pieces of information and working off different templates, a miscommunicated change could lead to a tangled web of information. Reliable access to 3D coordinated models and shop drawings ensures teams have the insights and tools they need to design and implement projects more effectively.
Better Cost Estimation
Cost estimation can be a time-consuming, error-prone, and stressful part of the construction process due to the sheer amount of information that needs to be measured, stored, analyzed, and shared. If this isn’t completed in a timely manner, project managers can’t take appropriate corrective actions to prevent rework and cost overrun.
A 5D estimate is a BIM that links 3D components with time schedule (4D BIM) constraints and cost-related information. Enabling teams to make virtual assessments between design, activities, and cost during preconstruction.
Less Rework
Studies have also shown that around 30% of the work performed by construction companies is actually rework -- and can reach as much as 35% of a project's contract value. To combat rework and cost overruns, the adoption of Building Information Modeling (BIM) technology has surged over the years, thanks to advancements in 3D modeling and gaming-powered software that made full-3D plans a reality.
BIM gives teams access to 3D coordinated models and shop drawings that can be easily compared to field conditions. More trust and buy-in of the model early on means clearer expectations and less rework later.
Jeremy Felix from Okland Construction puts it best: “Once we’ve got things coordinated in the model using the Coordination Issues tool and the trades are viewing the model using the Models tool, they’ll install their items in the proper coordinated space. That prevents rework.”
Reduced Risk
BIM helps to reduce risk by equipping teams with the tools they need to confidently compare site conditions to 3D models and 2D drawings. Take it from Procore customer, Haselden Construction, “They can see that tangible number in front of them...these VDC guys probably saved us $100,000 on a project because we didn’t have to do all this rework — which means we didn’t have to reorder materials, we didn’t have to respend man-hours, and we didn’t have to extend our schedule.” Thanks to the power of BIM, projects stay on track and budgets remain sound.
Improved Safety
Rework can lead to accidents and injuries on the jobsite. With BIM technology, teams are equipped with the tools they need to plan ahead and efficiently react to surprises in the field. Empowering superintendents, foremen, and the trades to do their best work means less careless errors from rushing or trying to cut corners. The end result is higher-quality projects, increased productivity, and improved jobsite safety.
Smoother Project Closeouts
Rework and project delays can set a project back significantly. 6D BIM drives better business outcomes by linking attribute data to support facilities management and operation. This data—from component manufacturers, installation dates, required maintenance, configuration details for optimal performance, energy performance, and more—makes project data easily digestible.
Whereas with paper files, some details could have easily gone unnoticed, 6D BIM ensures data is interrogated graphically and can be leveraged for future building construction. Seamless decision-making during the design process means more proactive planning, and ultimately smoother project closeouts.
The Future of BIM
With today’s fast timelines, tight margins, and growing expectations, businesses can no longer afford to lose time and money to miscommunication and poor collaboration. BIM offers a glimpse into the future of a project and a chance to remedy issues before they become a reality.
3D BIM only scratches the surface on what this technology has to offer. Augmented BIM models ranging from 4D (scheduling data), 5D (cost and material estimations), 6D (sustainability), 7D (facility management), and 8D (occupational health) are transforming building information modeling into building information optimization. When you factor in other new technologies such as VR and Computation Design, you can create an even more immersive modeling environment to generate information even faster.
In a world that is always on the edge of innovation, the future of BIM is bright. To ensure your business maintains its competitive edge, learn how BIM
Categories:
Tags:
Written by
Harshil Gupta
25 articles
Harshil Gupta is a Product Marketing Manager at Procore. Backed by a stint in engineering and rich experience in growth and product marketing, he's enthusiastic about the role of technology in elevating and enabling other industries. He lives in Toronto.
View profileExplore more helpful resources
The 5 Key Types of Construction Contracts
There are five common types of construction contracts: lump sum (or fixed price), time and materials (T&M), unit price, guaranteed maximum price (GMP), and cost-plus. Each of these contract types...
Design-Build vs Design-Tender-Build: Which Is Right for Your Project?
Construction project delivery methods dictate how project stakeholders interact throughout the construction phases. Design-build and design-tender-build are two of the most common delivery methods. While their names sound similar, they...
Construction Specifications: The Foundation for Project Clarity
When people hear the term “construction documents,” their minds often go straight to the applicable drawings. Those visual representations of what will be built provide a huge measure of guidance...
The Design-Build Method of Project Delivery Explained
Design-build is a construction project delivery method that has been around for centuries — but there has been a resurgence of interest in applying it to Canada’s modern construction. Some...