Request a DemoLog In(844) 692-0626
    • Americas
    • América Latina (Español)
    • Canada (English)
    • Canada (Français)
    • United States (English)
Request a DemoLog In
cta-construction-image

Take Your Knowledge to the Next Level

Unlock your career potential with our free educational courses on Health & Safety, Data in Construction, and more.

Learn More

—  11 min read

How to Manage Construction Back Charges to Reduce Financial Risk

By 

Last Updated Aug 13, 2024

Backhoe demolishing a building

Unexpected expenses in construction projects — such as repairing a damaged wall, reworking substandard craftsmanship or unforeseen delays — can significantly disrupt project progress and budgets. Proper management of these costs helps to avoid unfair financial strain and maintain project momentum. Without a clear understanding of how to handle these expenses, disputes and complications can arise.

Back charges provide a structured method for allocating these additional costs so the financial burden is distributed fairly without disrupting cash flow or project timelines. However, misunderstandings in how and when back charges apply can lead to significant financial losses. Proper understanding and handling of back charges can mitigate financial risks and support a collaborative environment among all project stakeholders.

This article offers practical insights and strategies for effectively managing back charges so projects can proceed smoothly despite potential challenges.

Table of contents

What are construction back charges?

A back charge is a financial mechanism in construction used to allocate costs incurred due to incomplete, defective or delayed work. It serves as adjustments to the contractual commitments rather than direct cash transactions. Back charges can encompass various expenses, including labor, materials and other related costs needed to rectify the issues caused by the subcontractor.

For example, if an electrician performs substandard work inside a wall and needs to re-enter to fix an issue with the electrical wiring, it can lead to additional costs. In the process of accessing the area that needs rework, the electrician must cut into the wall, damaging the drywall. Since electricians typically do not repair drywall, the general contractor must bring the drywaller back to fix the damage. The cost of this repair is then charged back to the electrician by reducing their contract value by the amount paid to the drywaller. This adjustment ensures that the overall project budget remains balanced without any additional cash exchange.

Learn more: The Importance of Minimizing Construction Rework

There is a common misconception that back charges involve immediate cash compensation or transfer. In reality, they are managed through contract adjustments. The expenses incurred by one party are offset by increasing their contract value, while the party responsible for the issue sees a corresponding decrease in their contract value. This method ensures that all costs are accounted for within the contractual framework, avoiding direct cash flow disruptions.

A thorough understanding of how back charges work allows for more effective project management. It ensures costs are allocated fairly and subcontractors are held accountable for their work without causing unnecessary cash flow issues for the project.

Why are back charges ordered?

Back charges primarily arise for the following reasons.

  • Defective Work

    When subcontractors deliver substandard work, it necessitates additional labor and materials to rectify. As mentioned in the example above, if an electrician needs to perform rework inside a finished wall, causing additional drywall work, the cost of repairing the drywall would be charged back to the electrician.

  • Incomplete Work

    Instances where subcontractors fail to complete their work on time, often result in additional costs. These schedule delays often require extra labor or expedited resources to meet project deadlines, resulting in back charges.

  • Damage to Property

    When subcontractors cause damage while performing their tasks, the repair costs are charged back to the responsible subcontractor to cover the unexpected expenses.

  • Site Clean-up and Safety Violations

    Costs incurred due to subcontractors failing to maintain clean or safe work environments. If a subcontractor leaves the site in an unsafe condition or fails to clean up after their work, the general contractor incurs additional costs to address these issues, leading to back charges.

Examples of Construction Back Charges

Here are a few scenarios that illustrate the role of back charges on construction projects.

Damage Caused by Subcontractors

A subcontractor might accidentally cause damage while performing their work. Imagine a concrete delivery truck backing into a neighbor’s fence, causing substantial damage. The general contractor would be responsible for repairing the fence and would issue a back charge to the subcontractor responsible for the damage to cover the repair costs.

Financial Implications of Delays

Delays in project phases have significant financial implications. For example, if electrical work is delayed and the drywall installation cannot proceed as scheduled, it results in additional costs for the general contractor due to liquidated damages. The general contractor might have to bring in extra crews to make up for lost time, and these additional labor costs would be back charged to the subcontractor responsible for the delay.

5 Best Practices for Managing Back Charges

Managing back charges efficiently is important for maintaining project integrity and financial stability. The following best practices can help contractors handle back charges.

1. Write and Agree to Clear Contractual Terms

Having clear and explicit definitions within contracts aids in managing back charges. Contracts should detail the conditions under which back charges can be applied, the process for determining the costs and the responsibilities of each party. This clarity helps prevent misunderstandings and disputes, ensuring all parties are aware of their obligations and the potential financial implications.

2. Document Everything

Keeping thorough records of all work performed and related costs supports justifying back charges. Detailed documentation should include bid packages, daily logs, progress reports, photographs and any correspondence related to the work. Accurate records provide the necessary evidence to support the application of back charges, making it easier to resolve disputes and ensure accountability.

3. Communicate and Notify ASAP

Promptly informing subcontractors of issues as they arise allows for effective back charge management. By notifying subcontractors immediately, they have the opportunity to address the problems before they escalate. This proactive approach helps mitigate additional costs that can easily compound and fosters a collaborative environment where issues are resolved more efficiently.

4. Create Detailed Invoicing

Using transparent and detailed billing practices can avoid disputes over back charges. Invoices should clearly outline the costs associated with back charges, including a breakdown of labor, materials and any additional expenses. Providing detailed invoices helps ensure that all parties understand the basis for the charges, reducing the likelihood of disagreements.

5. Resolve through Negotiation and Mediation

Encouraging amicable resolutions through negotiation or mediation can be beneficial when disputes over back charges arise. These methods allow parties to discuss their differences and find mutually acceptable solutions without resorting to litigation. By fostering open communication and cooperation, negotiation and mediation can help maintain positive working relationships and keep projects on track.

By implementing these practices, contractors can manage back charges more effectively, ensuring fair cost allocation and maintaining the progress of construction projects.

Financial Management of Construction Back Charges

Balancing project budgets and maintaining smooth operations requires careful financial management of back charges. 

How Back Charges Affect Contract Values

Back charges directly impact the value of contracts by adjusting the amounts owed to subcontractors. When a subcontractor's work leads to additional costs, these expenses are deducted from their contract value.

For instance, if a subcontractor damages a part of the project, the cost to repair this damage is subtracted from their payment. This process ensures that the project budget remains balanced without requiring a direct cash exchange. By reducing the subcontractor’s contract value, the general contractor can allocate the funds necessary to cover the repair or additional work.

Proactively Planning for Back Charges

Effective financial management of back charges includes planning for unexpected costs. Maintaining a healthy contingency fund, typically between 2-4% of the overall contract value, mitigates the impact of unforeseen expenses. 

For example, if equipment on-site causes accidental damage, having a contingency fund ensures that there are resources available to cover these costs without disrupting the project’s financial stability. By anticipating potential back charges, contractors can manage their budgets more effectively and reduce the financial impact of unexpected events.

The Technical Challenge of Back Charges

Managing back charges presents several technical challenges, particularly concerning cash flow. General contractors often face cash flow issues because they must pay for repairs or additional work upfront before recouping these costs from subcontractors. This situation can strain the contractor's financial resources.

One way to address this is through billing adjustments to the project owner. For example, if a back charge is applied, the general contractor might bill the owner for the repair costs while simultaneously reducing the subcontractor’s contract value. This approach ensures that the contractor has the necessary funds to cover the expenses without waiting for the subcontractor’s payment from the owner, maintaining cash flow stability. However, this process can be complex and requires careful financial planning and communication to ensure that all parties understand the adjustments being made.

Stay updated on what’s happening in construction.

Subscribe to Blueprint, Procore’s free construction newsletter, to get content from industry experts delivered straight to your inbox.

Subscribe
Man holding tablet in a construction site

How to Handle Back Charges

Effectively managing back charges can reduce project delays and financial discrepancies. These methods offer a systematic approach to handling back charges with precision.

Avoiding or Reducing Costs

Managing back charges begins with proactive measures to avoid or minimize the costs associated with them. Encouraging trades to negotiate directly can help avoid inflated costs. When subcontractors handle disputes among themselves, they can often find mutually agreeable solutions without the added expenses that may come from involving third parties or the general contractor. Additionally, giving subcontractors the opportunity to fix their own mistakes before back charges are applied can help avoid high external charges. If issues are handled internally by the subcontractor or another trade on-site, it can often result in lower costs and quicker resolutions compared to bringing in an external party.

Change Order Management

Ensuring that all change orders, especially deductive ones, are signed in the correct order helps avoid administrative challenges and delays. For example, if a deductive change order is not processed before subsequent additive change orders, it can cause confusion and disputes over billing and payments, resulting in project delays and financial discrepancies. This process ensures that the sequence of financial adjustments is clear, preventing backlog and potential financial strain on the project.

Timing of Billing

The timing of billing for back charges can significantly impact cash flow management. It is advisable to delay billing deductive change orders until the end of the project. This approach helps manage cash flow more effectively and prevents owners from reducing their immediate cash outflow by insisting on early deductions.

Some owners may try to reduce their immediate cash outflow by pushing for early billing of deductive change orders. By delaying these until the end, contractors can ensure that they receive the necessary funds to cover ongoing project costs without unnecessary financial strain.

Who pays for back charges?

Back charges are generally the responsibility of the subcontractors who caused the additional costs. When a subcontractor's work leads to defects, delays or damage, they are typically held financially accountable for the necessary corrections. This often means reducing their contract value by the amount required to cover the costs.

However, general contractors are responsible for ensuring these costs are correctly billed and managed. They must meticulously track and document the back charges, ensuring that the owner is billed appropriately for any work that falls outside the subcontractor's scope. Proper billing practices maintain the project's financial stability and ensure that all parties are fairly charged.

Though back charges are generally the responsibility of the subcontractor, this isn’t always the case. Often, there will be disputes over who is actually responsible, which then leads to litigation. And like most legal disputes, whoever has better documentation will have a better case, so it is good practice to have robust documentation of the what, who, why and when — especially when unexpected expenses come up. 

Recouping Costs: Challenges Faced by General Contractors

General contractors often encounter several challenges when attempting to manage and recoup costs associated with back charges.

  • Contract Adjustments

    One primary challenge is managing the adjustments to subcontractor contracts to reflect the back charges. Since back charges are not direct cash transfers but rather reductions in the subcontractor's contract value, it requires careful tracking and accounting to ensure that all costs are accurately reflected.

  • Ensuring Proper Billing to the Owner

    Another challenge is ensuring that all costs associated with back charges are properly billed to the owner. General contractors must ensure that the adjustments made to subcontractor contracts are correctly reflected in the overall project billing, maintaining transparency and accuracy in financial records.

  • Maintaining Cash Flow

    While back charges themselves do not involve direct cash payments, they can still impact the cash flow of the project. General contractors need to manage these financial adjustments carefully to ensure they have sufficient funds to cover the immediate costs of rectifying issues before the contractual adjustments take effect.

By understanding the responsibility distribution and addressing the challenges in managing contract adjustments and billing, general contractors can handle back charges more effectively, ensuring a fair and balanced financial approach to construction projects.

Improving Back Charge Processes

As the construction industry increasingly embraces technology, integrating digital tools and platforms can streamline the tracking and resolution of back charges, reducing administrative burdens and enhancing transparency.

Encouraging a culture of accountability and continuous learning among all stakeholders will ensure that back charges are handled efficiently and fairly. By looking ahead and embracing innovation, the industry can turn the challenge of back charges into an opportunity for improved project management and stronger collaboration.

Was this article helpful?

Thank you for your submission.

100%

0%

You voted that this article was . Was this a mistake? If so, change your vote here.

Scroll less, learn more about construction.

Subscribe to The Blueprint, Procore’s construction newsletter, to get content from industry experts delivered straight to your inbox.

Thank you!

You’re signed up to receive The Blueprint newsletter from Procore. You can unsubscribe at any time.

Categories:

Financial Management

Tags:

Written by

TJ Forbes

15 articles

TJ Forbes is a Senior Solutions Engineer at Procore, specializing in financials products, analytics, ERP integrations, workflows, reporting and accounting solutions. He previously worked as a financial manager and project accountant for Stiles, a commercial real estate firm in Ft. Lauderdale. TJ holds a Masters in Financial Management from Southern Adventist University.

View profile

Taylor Riso

59 articles

Taylor Riso is a marketing professional with more than 10 years of experience in the construction industry. Skilled in content development and marketing strategies, she leverages her diverse experience to help professionals in the built environment. She currently resides in Portland, Oregon.

View profile

Explore more helpful resources

article-image

Evaluating Construction Software: How to Find the Perfect Fit

When it comes to building out a comprehensive construction tech portfolio, success depends less on having the flashiest, the most expensive or the highest number of solutions, and more on...

article-image

Constructability Reviews: Moving From Design to Reality

Before concrete is poured or hammers are swung, a construction project requires the proper scrutiny to determine if the project is even possible. This is where a constructability review comes...

article-image

BIM Clash Detection: Using Virtual Tools to Catch Problems Early

On a simple build — say, a two-story house — it’s fairly straightforward to coordinate what needs to be built where and when. But as the scale of the project...

article-image

The Role of Civil Engineering in Modern Infrastructure Development

Civil engineers play a key role in designing the infrastructure that keeps society functioning. From roads and bridges to water treatment facilities and large-scale developments like dams and skyscrapers, civil...

Procore is committed to advancing the construction industry by improving the lives of people working in construction, driving technology innovation, and building a global community of groundbreakers. Our connected global construction platform unites all stakeholders on a project with unlimited access to support and a business model designed for the construction industry.

LinkedIn Icon
LinkedIn
Facebook icon
Facebook
Twitter icon
Twitter
Instagram Icon
Instagram
YouTube icon
YouTube

Call us at (844) 692-0626 to speak with a product expert.

Apple LogoApple App StoreGoogle Play logoGoogle Play

Downloads

Apple LogoApple App StoreGoogle Play logoGoogle Play
  • Privacy Notice
  • Terms of Service
  • Do Not Sell Personal Information

© 2024 Procore Technologies, Inc.