— 10 min read
Creating & Managing Successful Design-Build Proposals
Last Updated Mar 5, 2025
Last Updated Mar 5, 2025

Winning a design-build project starts long before the proposal is submitted. Unlike traditional design-bid-build, where contractors respond to a fully developed set of plans, design-build requires teams to develop and present their own approach to the project. A strong proposal doesn’t just demonstrate qualifications — it illustrates a clear understanding of the owner’s goals, a well-coordinated design and a plan for execution that balances cost, schedule and constructability.
This article breaks down key strategies for managing design-build proposals, from early planning to final submission. It will explore how to structure an effective proposal, coordinate teams and avoid common pitfalls that can derail the process.
Table of contents
Assembling the Right Team
A winning design-build proposal starts with the right team. Every project has unique demands, and assembling the right mix of designers, subcontractors and key personnel is key to developing a strong, competitive submission.
Choosing the Lead Designer
The choice of lead designer largely depends on the project type. For instance, a project with heavy structural requirements, such as a bridge or high-rise building, will benefit from a designer with expertise in structural engineering. In contrast, healthcare facilities like hospitals require designers with specialized experience in healthcare environments to meet medical standards and optimize patient flow. Selecting a lead designer whose expertise aligns with the project’s unique demands leads to a smoother process from architectural design through construction.
Subconsultants & Major Subcontractors
In addition to the lead designer, a well-rounded design-build team often requires a diverse set of subconsultants and subcontractors who specialize in specific disciplines. Depending on the project's needs, these may include subcontractors, electrical engineers, mechanical engineers, civil engineers, quality managers, environmental consultants or any other specialized professionals necessary to complete the project efficiently and to code.
It's important to carefully evaluate and select these team members so that each aspect of the project — whether it’s sustainability, energy efficiency or structural integrity — gets the attention it deserves. Early coordination between these specialists is central to this phase as the team develops the design, refines pricing and evaluates constructability. Engaging key subcontractors and consultants early helps identify potential challenges, optimize the approach and create a proposal that is competitive, cost-effective and feasible.
Owner Expectations for Key Personnel
Many public sector projects have strict requirements for named roles within the project team. Agencies may require key personnel — such as a quality manager, environmental manager or public communications lead — to be identified in the proposal. In some cases, these roles are contractually tied to the project, meaning if a named individual is removed or replaced after award, the contractor could face liquidated damages or other penalties.
This requirement helps owners maintain project consistency, comply with regulations and reduce risk. Because of this, firms must be strategic in selecting personnel, confirming their availability and securing commitment from individuals named in the proposal.
The Design-Build Proposal Process
The proposal process for design-build projects can vary significantly in terms of timeline and complexity. Understanding the components of each phase is important to effectively manage time, resources and deliverables.
Request for Qualifications Stage
The request for qualifications (RFQ) stage is often the first step in the proposal process and can span anywhere from two weeks to four months, depending on the complexity of the project. For simpler RFQs, the response may only require submitting a few resumes and project descriptions that demonstrate your team's relevant experience. However, for more intricate or larger-scale projects, a comprehensive response is necessary, including detailed technical approaches, safety plans, organizational structures and project schedules. It is important to assess the project’s requirements early on to determine the level of effort needed for an RFQ submission.
Proposal Development (Shortlist to Submission)
After successfully passing the RFQ stage, shortlisted firms move into the proposal development phase. This phase can last anywhere from six weeks to 18 months, largely depending on the project's complexity and scope.
Key tasks during proposal development include:
- Reviewing contract documents and bid instructions (ITP – Instructions to Proposers) to fully understand project requirements, evaluation criteria and submission obligations.
- Advancing the design to a level that supports accurate pricing, constructability analysis and risk evaluation. This may involve developing conceptual plans, refining design alternatives and coordinating with specialty subcontractors to verify feasibility.
- Managing team responsibilities through proposal workbooks and tracking sheets to keep tasks on schedule and confirm that all required elements are addressed.
- Assuring compliance with the RFP requirements to avoid delays or disqualification, including verifying that all forms, certifications and submittal criteria are met.
The proposal development phase is often where coordination and communication across the team become extremely important, as every detail must align with the expectations set forth by the client. Proper planning and attention to detail can help streamline this process and reduce the risk of errors.
Presenting the Design
When preparing design-build proposals, presenting the design is about striking the right balance between technical depth and visual clarity. Owners and stakeholders need both the details that demonstrate a project's feasibility and the clear visuals that help them understand complex concepts at a glance.
Balancing Technical and Visual Presentation
Owners expect a proposal to provide not just the technical specifications but also visuals that make those details accessible. The goal is to communicate complex design information in a way that’s both precise and understandable. A proposal needs to show the technical rigor behind the design while also using visuals that convey the project’s scope and design intent clearly.
Key graphics often included in proposals are:
Pro Tip
Manage Design Iterations Wisely
Design changes are inevitable in a design-build proposal. Setting clear internal deadlines for design milestones helps keep the proposal team aligned. Regular coordination between designers, estimators and key subcontractors ensures pricing reflects the latest design updates. Building hidden float into the schedule can also help absorb last-minute changes without jeopardizing the submission timeline.
- Site plans and layout diagrams to illustrate the project’s overall configuration.
- Floor plans that clearly depict spatial arrangements, circulation and zoning, making it easier for stakeholders to grasp the design’s functionality.
- Cross-sections with added color for clarity, helping to communicate building elevations, structural relationships and how the space will be used.
- Rendered construction sequencing and logistics, which show the construction process over time. This helps to clarify the step-by-step flow of the work and demonstrate how the team will manage project milestones.
These visuals act as key communication tools, transforming complex design concepts into intuitive images that make it easier for non-experts to grasp the proposed design. Clear graphics help communicate the project’s vision and execution, whether it’s a high-rise, hospital or large-scale infrastructure project.
D-Engineering for Readability
"D-engineering" is the process of simplifying technical concepts so all stakeholders, regardless of their expertise, can understand them. While some disciplines — such as geotechnical or environmental engineering — are inherently technical, other aspects of a proposal should be presented in a way that is accessible to a broader audience.
This often means breaking down complex systems — such as structural components, building systems, or construction sequencing — into clear, digestible explanations. Instead of relying solely on dense technical descriptions, proposals should incorporate annotated diagrams, key takeaways and straightforward language that highlights performance criteria and design intent. The goal is to provide enough technical depth to demonstrate expertise while making the information readable for decision-makers who may not have a technical background.
By prioritizing clarity, proposals become more engaging, making it easier for owners and stakeholders to grasp the vision behind the design. This approach strengthens the overall proposal, helping to communicate value, innovation and feasibility more effectively.
Design-Build Proposal Management Best Practices
Managing a design-build proposal requires a structured approach, clear communication and the right tools to keep everyone on track. Implementing best practices early can help teams stay organized and submit a stronger, more competitive proposal.
Tracking & Compliance Tools
Managing a proposal effectively requires tools that help keep every aspect organized and assure full compliance with the project requirements. One of the most effective methods for tracking proposal progress is the Proposal Workbook, which serves as a central hub for all proposal activities. This document typically includes:
Schedule
A timeline of all proposal milestones, deadlines and review dates
Contact Lists
Updated contact information for all internal and external stakeholders involved in the proposal
Compliance Matrices
Maps proposal requirements to specific sections of the submission, so that nothing is overlooked
Checklists and Form Tracking
Tracks all necessary documents, signatures and forms that are required for submission
By organizing all these elements into one document, teams can monitor their progress, check for gaps in content or missing documentation and verify that the proposal meets all the submission guidelines — such as formatting, font size and page limits.
Managing External Contributors
Collaboration with external partners, such as subconsultants and subcontractors, is a key component of proposal success. Keeping everyone on track and accountable requires clear communication and consistent follow-up. Here are some best practices.
Weekly Calls
Regular check-ins keep everyone aligned and focused on key deliverables.
Shared Workspaces
Cloud-based platforms like SharePoint or Teams allow all stakeholders to access and contribute to proposal documents in real-time.
Direct Messaging
Sometimes, a quick text or direct message can help resolve a last-minute issue or clarify a question quickly.
When deadlines are tight, accountability is everything. Using a "Name-and-Shame" approach — where outstanding tasks are called out in team-wide emails or shared tracking documents — puts pressure on contributors to follow through while keeping leadership informed. Public visibility helps keep the proposal moving without constant follow-ups.
To make this method most effective, clearly communicate deadlines upfront, provide regular status updates and give contributors a chance to address delays before escalating the issue publicly. When used strategically, this approach reinforces accountability without creating unnecessary tension.
Danica Mason
Principal
Red Team Go
Common Mistakes when Preparing Design-Build Proposals
Despite all the planning and preparation, there are a few traps that even experienced teams tend to fall into when working on design-build proposals. Knowing what to watch out for can make all the difference between a smooth process and a last-minute scramble.
Pro Tip
Build Relationships Early
Engaging with stakeholders early in the process can make a big difference. The more time spent understanding the project’s goals and aligning with key players before the official RFP, the better the chances of creating a proposal that resonates with the owner.
Starting Too Late
One of the most common mistakes firms make is waiting until the proposal is officially released to begin preparations. This last-minute scramble often results in rushed submissions and overlooked details. By starting earlier—ideally aligning teams and gathering research well before the RFQ is published—teams can prepare more thoroughly, identify potential issues early and develop a more competitive proposal. Proactive planning can also give you time to address technical or strategic concerns that may arise during the process.
Not Reading the Contract Documents Early Enough
Waiting until the proposal deadline looms to dive into contract documents is another mistake that can lead to major risks. These documents often contain key information that affects project scope, schedules and terms. Failure to read through them thoroughly and ask questions early can lead to missed opportunities or unknown risks once the proposal is submitted. Teams should create a risk register early in the process, identifying potential risks and strategizing solutions or mitigation plans. The earlier a team uncovers potential issues, the better they can address them in the proposal and avoid costly missteps.
Understaffing the Proposal Effort
A proposal requires dedicated time and resources, and understaffing the effort can lead to avoidable errors or incomplete sections. Writing, estimating, coordinating and reviewing all require full-time attention. Relying on an overburdened team often results in rushed work, overlooked details, and inconsistencies across sections of the proposal.
Successful firms assign dedicated team members to key roles — whether it’s writing, estimating or proposal coordination — to keep the process focused and efficient. When everyone is focused on a specific part of the process, the proposal will be more cohesive and of higher quality.
Stay updated on what’s happening in construction.
Subscribe to Blueprint, Procore’s free construction newsletter, to get content from industry experts delivered straight to your inbox.

When Pursuit Strategy Translates into Project Success
A strong design-build proposal is a reflection of how a team thinks, plans and executes. Owners are looking for teams that bring clarity, coordination and problem-solving to the table from day one. Every decision made during the pursuit, from assembling the right team to refining the design and pricing strategy, shapes the project’s trajectory. The firms that approach this process with discipline and strategy set the foundation for a successful project.
Was this article helpful?
Thank you for your submission.
0%
0%
You voted that this article was . Was this a mistake? If so, change your vote here.
Scroll less, learn more about construction.
Subscribe to The Blueprint, Procore’s construction newsletter, to get content from industry experts delivered straight to your inbox.
By clicking this button, you agree to our Privacy Notice and Terms of Service.
Categories:
Tags:
Written by
Danica Mason
Danica, a ENR Northwest 2024 Top Young Professional, is the Principal of Red Team Go, having led the company for more than 14 years working with A/E/C industry clients to develop SOQs and Proposals, overall marketing strategies, business strategies, develop teams and teaming strategies, and provide DBE and Inclusion/Civil Rights Management, strategies, and tracking. With a long history of successful projects in the heavy civil industry, she has led her team to work with regional, national, and international companies to deliver projects ranging from $2 million to more than $15 billion. Red Team Go has a shortlist rate of 85% for projects across North America, encompassing design-build, P3, CMGC, CMAR, PM/CM, and hard bid prequalifications. The firm can lead projects, provide support for graphics, and lead technical writing and editing - Danica ensures flexibility to help clients in the ways that are needed. Red Team Go also focuses on branding and upbranding for clients, successfully leading these campaigns to provide companies with refreshed looks, new items for their own marketing purposes, and overall updated information to distribute to the industry. In addition to this, Danica leads teams in developing awards submittals - having written winning submittals for AGC Safety Awards, AGC Build America Awards, California Transportation Foundation Awards, MarCom, and DBIA awards.
View profileTaylor Riso
70 articles
Taylor Riso is a marketing professional with more than 10 years of experience in the construction industry. Skilled in content development and marketing strategies, she leverages her diverse experience to help professionals in the built environment. She currently resides in Portland, Oregon.
View profileExplore more helpful resources

How to Use a Crane Lift Plan (With Free Template)
Many construction projects require moving heavy materials, equipment and assemblies. These lifting operations depend on load-handling equipment (LHE) like cranes and derricks that are designed to relocate suspended construction components...

Mastering Construction Means and Methods for Every Project
In construction, “means and methods” refers to all the different techniques, tools, processes and strategies that contractors use to bring blueprints to life. Using the right means and methods can keep...

How to Manage Defective Specifications to Protect Project Outcomes
Success on any construction project relies heavily on effective communication between the people who own and design the project and the people who build the structure. Construction specifications are one...

Following Construction Standards: How to Comply With Confidence
Without meaningful guidelines, it can be difficult to judge performance on a given task – especially in construction, where projects are complex and require expertise in any number of disciplines....