Non-budgeted cost

A cost value that was not previously added to the project's budget.

Non-budgeted costs are expenses not included in the original project budget. They require careful management to ensure they don't lead to budget overruns, and often necessitate adjustments to the financial plan or approval from stakeholders.

Used in a sentence

The non-budgeted cost for the additional equipment requires management approval before proceeding.

Stay updated on what’s happening in construction.

Subscribe to Blueprint, Procore’s free construction newsletter, to get content from industry experts delivered straight to your inbox.

Learn More

Learn more about Non-budgeted cost

article-image

Construction Tax Deductions: A Quick Guide

Tax deductions offer a lot of opportunity for construction businesses to lower their tax liability, helping to free up cash flow and increase profitability. Because construction projects are so complex, tax deductions in the construction industry are nuanced, but there are many opportunities to use tax deductions for more effective financial management. This article discusses […]

article-image

How Contractors Can Use Measured Mile Analysis to Prove Claims

A measured mile is a method construction contractors can use to demonstrate lost productivity during a project in hopes of getting some of the additional costs back from project owners. Construction projects always aim to stick to their originally established budget and timelines. Unfortunately, in most cases, issues arise that get in the way of […]

article-image

Understanding Supplementary Conditions on Construction Contracts

No two construction projects are exactly alike — and the same goes for construction contracts. Even when using a standard contract form, owners and contractors sometimes use supplementary conditions to shape the contract documents to fit the project at hand better. Supplementary conditions may add additional information that isn’t included in standard contract terms, alter […]

article-image

Cost-Loaded Construction Schedule: Analysis, Risks & Benefits

Both scheduling and cost control are make-or-break aspects of construction projects, but in many cases the two areas are kept very separate from one another — the project scheduler and financial controller may never be in the same room to hash out a plan. Cost and schedule are both keys to project success, and each […]

Previous word: No damages for delaysUp Next: Non-combustible material

How can we improve this glossary entry?

Thank you!

Thanks for the feedback and helping us improve this glossary entry!

Procore is committed to advancing the construction industry by improving the lives of people working in construction, driving technology innovation, and building a global community of groundbreakers. Our connected global construction platform unites all stakeholders on a project with unlimited access to support and a business model designed for the construction industry.

LinkedIn Icon
LinkedIn
Facebook icon
Facebook
Twitter icon
Twitter
Instagram Icon
Instagram
YouTube icon
YouTube

Call us at (844) 692-0626 to speak with a product expert.

Apple LogoApple App StoreGoogle Play logoGoogle Play

Downloads

Apple LogoApple App StoreGoogle Play logoGoogle Play
  • Privacy Notice
  • Terms of Service
  • Do Not Sell Personal Information

© 2025 Procore Technologies, Inc.