Request a DemoLog In(844) 692-0626
    • Americas
    • América Latina (Español)
    • Canada (English)
    • Canada (Français)
    • United States (English)
Request a DemoLog In

Work Breakdown Structure (WBS)

A hierarchical decomposition of a project into smaller, more manageable tasks or components.

The WBS helps in organizing and managing project components more effectively, facilitating clear task assignment and progress tracking.

Used in a sentence

The WBS is a project management tool that breaks down the project into smaller, manageable components.

Synonyms/variation
  • Task Breakdown

  • WBS

Stay updated on what’s happening in construction.

Subscribe to Blueprint, Procore’s free construction newsletter, to get content from industry experts delivered straight to your inbox.

Learn More

Learn more about Work Breakdown Structure (WBS)

article-image

Work Breakdown Structure: Tips for Managing the Details

A challenging part of being a project manager or general contractor is accounting for the high number of variables needed to pull off a construction project. That’s why many people use a work breakdown structure. A work breakdown structure (WBS) is a project management technique that divides a complex project into small manageable tasks. Those […]

Previous word: Wood frameUp Next: Work in Progress (WIP) report

How can we improve this glossary entry?

Thank you!

Thanks for the feedback and helping us improve this glossary entry!

Procore is committed to advancing the construction industry by improving the lives of people working in construction, driving technology innovation, and building a global community of groundbreakers. Our connected global construction platform unites all stakeholders on a project with unlimited access to support and a business model designed for the construction industry.

LinkedIn Icon
LinkedIn
Facebook icon
Facebook
Twitter icon
Twitter
Instagram Icon
Instagram
YouTube icon
YouTube

Call us at (844) 692-0626 to speak with a product expert.

Apple LogoApple App StoreGoogle Play logoGoogle Play

Downloads

Apple LogoApple App StoreGoogle Play logoGoogle Play
  • Privacy Notice
  • Terms of Service
  • Do Not Sell Personal Information

© 2025 Procore Technologies, Inc.