Procore Company LogoLog In
    • Americas
    • América Latina (Español)
    • Canada (English)
    • Canada (Français)
    • United States (English)
    • Asia Pacific
    • Australia (English)
    • Singapore (English)
Log In
Lakeridge Junior High School powered by Procore

Project Story

Building a sustainable future with innovative construction

138,000 square feet. $68,600,000. 1,100 students

Lakeridge Junior High School powered by Procore

The Lakeridge Middle School was a new, multi-phased school construction project that included:

  • Demolition of the existing school and installing temporary classrooms, restrooms and a gymnasium

  • Construction of a new 138,000-SF middle school to accommodate 1,100 students, complete with new sitework, bus drop-off, parking and offsite improvements

  • A design and build to accommodate future green energy solar panel array

  • Passive ventilation system and integrated smart technology to signal teachers/students when to open and close windows to maximize natural heating/cooling elements

  • A courtyard designed to emulate the underwater vortexes created during the Great Missoula Flood, forming most of the Willamette Valley

  • 29 local trees harvested local and repurposed by Whole Trees as structural columns throughout the school

Photos Courtesy of Josh Partee
ROI increasing

ROI Report

Why the right tech is more crucial than ever.

See what solutions are driving results for industry leaders all over the world.

Browse All Resources

Ready to see it in action?

Stop jumping between apps to get a clear view of your project’s status.

(2,743)

(2,952)

(35K)

(2,910)